Water Main Improvements – Pipe Bursting

Project Info
  • Location: Village of Forest View
  • Commencement Date : June, 2010
  • Engineer’s Cost Estimate : $ 80,050.00
  • Contractor Bid Amount : $ 70,000.00
  • Engineering Change Orders : $ 0
  • Change Orders/Contract Change : 0/0
  • Project Completed On-time : Yes
Project Details

Village of Forest View, Water Main Improvements – Pipe Bursting

More Project Details

The improvements constructed as part of this project were located at the Village’s Southern limits from Maple Avenue to Wisconsin Avenue in the Village of Forest View.  After a thorough design and cost analysis the Village decided to install the proposed water main through use of pipe bursting.

The improvement also consisted of the removal and replacement of minor combination concrete curb and gutter, driveways, and sidewalks, pavement patching, adjustment to utility structures, and sodding of disturbed areas.

The project involved a great deal of public education.  Hancock Engineering held weekly progress meetings with Village and Contractor to ensure the project was moving along.

Project Team:

Brad Clark, P.E.
(Client Manager)

Brad Clark, P.E.
(Designer)

Brad Clark, P.E.
(Construction Engineer)

References:

Frank Yurka
Village Administrator
708-749-0310

Apollo Trenchless
(630) 816-8791